Manchester, CT

The project consisted of the renovations and upgrades to the existing HVAC systems and building automation system controls. The scope included the commissioning of the newly installed HVAC enhancements as well as the building automation system upgrades to the existing roof top units. The intent of the project was to optimize building performance with a focus on energy savings and efficient operation.