Project Overview
Hartford, CT – This 78,000-square-foot renovate-as-new specialized public high school includes spaces for classrooms, media spaces, gymnasium, administrative areas and cafeteria. SES provided commissioning services for compliance with the Connecticut High Performance Building Standards that included pre-design, design, construction and post occupancy services. The scope of work included commissioning of the HVAC equipment, central plant, air handling systems, terminal devices, general exhaust, emergency lighting, domestic hot water, fire alarm system, sight lighting controls, security, paging system, automatic temperature controls system and building envelope.
Save Energy, Time + Money
We’d love to hear from you about your project and discuss how our services can help you save energy, time and money. Please contact us anytime by phone, email or using the form below.