Retro-Commissioning

ECM Tip #3: Trim & Response

2024-07-04T08:16:52+00:00

HVAC System Trim & Response Resets When a building is newly constructed, one of the last steps performed on the HVAC system is the testing, adjusting, and balancing (TAB). The purpose of TAB is to verify the design air and water flows are properly supplied throughout the building. One of the most critical components [...]

ECM Tip #3: Trim & Response2024-07-04T08:16:52+00:00

ECM Tip #2: Optimal Start and Stop

2024-07-04T08:17:03+00:00

Before the days of advanced control systems, buildings would be preheated or precooled prior to occupancy using a standard warm up or cool down mode of operation. These primitive sequences would start the air handling units at a set time interval before the building entered into occupied mode. The air handling unit would then [...]

ECM Tip #2: Optimal Start and Stop2024-07-04T08:17:03+00:00

ECM Tip #1: BAS Schedule Adjustments

2024-07-04T08:17:14+00:00

Discussing building energy management can be overwhelming. Everyone wants to save energy and money, but utility contract negotiations, retrofitting HVAC systems, renewable energy, and battery storage can add a lot of complexity to the conversation. With numerous retro-commissioning projects under our belt, we want to share our knowledge with building owners and facility managers [...]

ECM Tip #1: BAS Schedule Adjustments2024-07-04T08:17:14+00:00
Go to Top