ECM Tip #2: Optimal Start and Stop
Katelyn Birge2024-07-04T08:17:03+00:00Before the days of advanced control systems, buildings would be preheated or precooled prior to occupancy using a standard warm up or cool down mode of operation. These primitive sequences would start the air handling units at a set time interval before the building entered into occupied mode. The air handling unit would then [...]